Go Back
ELECTRICAL AND ELECTRONIC WIRES EXTRUSION LINE
Mdoel: SJ-30, SJ-50, SJ-60, SJ-70
Certification: CE, CCC, CE, ISO
Payment&Shipping Terms: T/T
Minimum Order Quantity: 1 set
Packaging Details: Container
Delivery Time: 40 days after advanced payment
Warrant time: 12 months
Origin:China
Voltage: 380V-440V
Certification: CE, CCC, CE, ISO
Payment&Shipping Terms: T/T
Minimum Order Quantity: 1 set
Packaging Details: Container
Delivery Time: 40 days after advanced payment
Warrant time: 12 months
Origin:China
Voltage: 380V-440V
More Details
ELECTRICAL AND ELECTRONIC WIRES EXTRUSION LINE
1.APPLICATION:
Suitable for single layer, dual color, dual layer and three layer extrusion processes for making wires and cables with insulating wire materials such as PVC, LDPE, XLPE,LSHF, NYLON, TPU and TPE.
2. Main components of electrical extruder
- double reel pay-off rack
- traightener platform
- main extruder
- automatic dryer and hopper
- electric apparatus main control cabinet
- Double layer movable trough
- laser diameter gauge or Digital Diameter controller
- high speed printing machine
- double-wheels capstan
- Meter counter
- horizontal type wire-accumulator
- power frequency sparker
- double reel take-up machine
3. Spare Parts Brands:
- Motor: Dongguan Motor , Teco, ABB, Siemens
- Inverter : Japan Yaskawa, Siemens, Taiwan Teco
- Temperature Control Meter: Japan RKC;
- Auxiliary Relay: Japan Omron ;
- Ammeter and Voltmeter: Taiwan Risesun ;
- Indicator, Switch and Button: Taiwan TEND ;
- Contactor: Taiwan Shihlin
- Line Speed Meter: Taiwan FOTEK/Yangming
- Bearing : NSK, SKF
4. Other
- Payment:30% as deposit, the balance is before delivery
- Production date: 50-70 days after receive deposit.
- Price Valid Date: 30 days
5. Installation and Warranty:
- warranty time: transportation expenses of replacement of spare parts, transportation expenses ,food expenses and accommodation expenses of the engineer arriving at the buyer's company shall be bear by the buyer
- The buyer shall bear the cost of the round-trip air ticket for the first installation, and the transportation, accommodation and food expenses of the engineer arrives the customer’s country shall be bear by the buyer.
- Buyer should be paid not less USD 60 per day when engineer installation .
- All the equipment and machinery, material for installation and labor, translator charge should be on Buyer’s account.
- On site commissioning times. If we can't fly, we need remote debugging via video conference.
- Estimated installation days: 7-10 days.
5.Force Majeure
Seller and buyer shall not be liable if they can not full fill this contract by reason of natural disasters, war or other causes of accidental force, Seller and buyer should carry on fulfilling this contract when it recovers to normal situation.